Industrial - Process Waste Water Building
New Construction
Construction of a new Wastewater Building for a Charlotte, NC plant. Scope of work included:
- Demolition of existing loading docks, structural steel, and concrete foundations
- Sitework including grading, retaining walls, and asphalt paving
- Concrete foundation walls, footings, pits/trenches, slabs, and paving
- Storm drainage
- Pre-Engineered Steel building
- Plumbing
- HVAC
- Electrical
- Fire Protection
- Fire Alarm