Expansion of existing loading dock and concrete paving. Project included sitework, demolition, concrete, steel erection, and roll up door & dock equipment. Project completed 2012.
Concrete foundation walls, footings, pits/trenches, slabs, and paving
Storm drainage
Demolition of existing loading docks, structural steel, and concrete foundations
Sitework including grading, retaining walls, and asphalt paving