Industrial - Process Waste Water Building

New Construction

 Construction of a new Wastewater Building for UniFirst Corporation at their Charlotte, NC plant. Scope of work included:

  • Demolition of existing loading docks, structural steel, and concrete foundations
  • Sitework including grading, retaining walls, and asphalt paving
  • Concrete foundation walls, footings, pits/trenches, slabs, and paving
  • Storm drainage
  • Pre-Engineered Steel building
  • Plumbing
  • HVAC
  • Electrical
  • Fire Protection
  • Fire Alarm
Share by: